Elevate low-lying bridges

Elevate low-lying bridges
Hazards
Assets
Measure Type
Gray Engineering vs Nature Based Solutions

Details

Based on flood projections and flood history, elevate bridges to prevent inundation and reduce service disruptions.

Capital Cost

High

Operations & Maintenance

Low – assuming bridge is properly elevated to manage flows

Effectiveness

High – can reduce or eliminate flood risk

Flexibility

Low – it is generally cost-prohibitive to modify fixed infrastructure once constructed

Barriers to Implementation

Cost; permitting; potential downstream impacts

Equity

Ensure the availability of alternate public transportation routes so that capital improvements do not impede commuting for public-transportation dependent communities and equity focus areas